
Allcon Budownictwo has taken on the role of the general contractor for a complex that includes a production hall, a warehouse, and an office building, planned by MMR Group for construction in Dębogórze, within the Kosakowo municipality (Pomeranian Voivodeship). As part of this project, which was first reported in September 2023, a facility with a total area of 8,100 m² and a volume exceeding 51,000 m³ will be built. It is worth noting that during the design phase, the services of architect Marek Twardowski from the Gdańsk-based studio Architonika were utilized. ■
PREM Inwestycje
ul. Wiklinowa 15C, 03-167 Warszawa
tel. (+48) 602 81 01 82
e-mail: zamowienie@preminwestycje.pl