
Mostostal is going to build 1st stage (196 flats) of multi-family complex in Warsaw. A company with ties to Mostostal S.A. has prepared construction of the 1st stage (196 flats) of the "Home Factory" residential complex on 8 Kotsisa Street in Warsaw-Praga Północ. Two multi-family buildings with 198 flats are going to be erected in the location of the demolished FSO warehouses. Design of the investment, planned on a 4.5-ha lot, has been prepared by PPFP Architekci. ■
PREM Inwestycje
ul. Wiklinowa 15C, 03-167 Warszawa
tel. (+48) 602 81 01 82
e-mail: zamowienie@preminwestycje.pl